Green Hydrogen Roadmap for Nepal

Page status
Working page
Updated
2026-05-12

Open in the interactive explorer and map

Summary

Strategic roadmap for producing green hydrogen from Nepal's surplus monsoon hydropower via electrolysis. Envisions an entirely new domestic industrial ecosystem absorbing stranded wet-season power.

Key Data Points

  • Primary target: domestic green ammonia/fertilizer production (Nepal imports 100% of chemical fertilizers)
  • A domestic green fertilizer plant could absorb up to 500 MW of continuous baseload power
  • Replacing coal in Nepal's cement clinker production would require 227,743 tonnes of green hydrogen annually, needing 2,002 MW of dedicated hydropower
  • Projected viable production cost: $2.15/kg by 2035
  • Government adopted Green Hydrogen Policy in 2024 with tax exemptions and regulatory framework
  • Commercial pilots targeted for 2025–2027, industrial scale by 2035

Relevance to Project

Central to Green Hydrogen Nepal and the demand-creation argument in Domestic-Led Hydro Strategy. Addresses Stranded Generation by creating domestic demand for surplus monsoon power.

Limitations

  • Roadmap, not committed project pipeline. The ammonia, fertilizer, and cement-substitution figures are planning scenarios rather than financed projects.
  • Demand-creation assumptions. The roadmap assumes industrial offtake, electrolysis deployment, water availability, and fertilizer-market integration that are not yet demonstrated in Nepal.
  • Cost trajectory uncertainty. The projected $2.15/kg production cost by 2035 depends on equipment-cost declines, power-price assumptions, and utilization rates.
  • Policy still early-stage. The 2024 Green Hydrogen Policy creates a framework, but pilot delivery, permitting, and industrial procurement models remain unsettled.