155 MW · survey/study stage · on the Tamor · in Taplejung district.
Specifications
| Parameter | Value |
|---|---|
| Capacity | 155 MW |
| Status | Survey / study |
| River | Tamor (eastern Koshi Basin) |
| District | Taplejung |
| Province | Province No 1 |
Significance
At 155 MW, Super Tamor is one of the larger survey-stage projects in eastern Nepal, though it sits in the shadow of the much larger Upper Tamor (285 MW, under construction) on the same river. The Tamor basin has attracted attention for both run-of-river and storage development potential, with multiple projects at different licence stages competing for water allocation and transmission evacuation from a relatively undeveloped eastern corridor.
Notes
See also
- Koshi Basin
- Upper Tamor — the dominant project on the same river (285 MW, under construction)
- Middle Tamor — mid-sized project on the same river (54 MW)
- Tamor Storage — storage proposal on the Tamor