Research compilation on the Available Declaration (AD) penalty mechanism in Nepal's standard hydropower PPA. Based on direct PPA text analysis by Parajuli (2023) and ERC regulatory commentary.

Key data extracted

  • Article 10.2 formula: Penalty = [0.80 × min(Contract Energy, AD) - (Actual + Scheduled Outage + Forced Outage + Force Majeure)] × Purchase Rate
  • No curtailment exemption: Off-taker curtailment is not listed as excusable cause. NEA can order reduced output and simultaneously penalise for the resulting shortfall.
  • Article 10.1(Ka) reserve margin: NEA can withhold up to 10% of peak-period Contract Energy as system reserve with zero compensation — and then still penalise for shortfall below 80%.
  • No "deemed generation" provision: Unlike IFC model PPAs, Nepal's standard PPA does not treat off-taker curtailment as compensable deemed generation.

Limitations

  • Research compilation, not the contract corpus itself. The page summarizes PPA-clause analysis and regulatory commentary; it is not a complete archive of signed PPAs.
  • Clause-level focus. The source isolates Article 10.1/10.2 AD-penalty mechanics and does not quantify how often NEA actually applies penalties in practice.
  • Curtailment interaction unresolved. The no-deemed-generation finding identifies a contractual exposure, but the source does not provide case-by-case adjudication history.
  • Legal interpretation boundary. The analysis describes contract structure and regulatory implications; it is not a formal legal opinion.