NEA Transmission Length FY 2076/77
- Page status
- Working page
- Updated
- 2026-05-12
Summary
This data page records NEA's FY 2076/77 transmission-line length by voltage class, preserving a pre-build-out snapshot of the legacy 66/132/220 kV system and the first operational 400 kV segment.
NEA's FY 2076/77 transmission-length table captures the grid just before the full 400 kV build-out visible in later years. It is the cleanest single-book snapshot for the legacy 132/220 kV system plus the first operational 400 kV segment.
FY 2076/77 Totals
| Voltage level | Circuit-km |
|---|---|
| 66 kV | 514 |
| 132 kV | 3240 |
| 220 kV | 437 |
| 400 kV | 78 |
| Total | 4269.7 |
Why It Matters
- The 132 kV system still dominated the physical grid, which is one reason evacuation bottlenecks remained structurally a 132/220 kV problem even after the first 400 kV assets appeared.
- The
78circuit-km at 400 kV is the early backbone era rather than a mature national 400 kV mesh. That context matters when reading Hetauda–Dhalkebar–Inaruwa 400 kV Backbone as a singular asset rather than a redundant network. - The gap between
3240km at 132 kV and437km at 220 kV helps explain why corridors such as Khimti–Dhalkebar 220 kV Hydropower Corridor and the later Nepal Transmission System — 400 kV Landscape & Cross-Border Plan (2025) compilation are so central to the stranded-generation story.
Coverage / Method
The table is transcribed from the NEA Transmission Directorate line-length comparison table in the FY 2076/77 transmission annual book. It covers reported circuit-kilometres by voltage level for 66 kV, 132 kV, 220 kV, and 400 kV transmission lines in that fiscal-year snapshot.
Caveats
The source is a historical annual-book snapshot and does not represent later 400 kV build-out, project commissioning, or route-level corridor status. Circuit-kilometres measure line length by voltage class, not available transfer capacity, congestion, redundancy, or substation readiness.