POWERGRID FY 2024/25 — Gorakhpur–New Butwal Joint Venture Record
- Page status
- Working page
- Updated
- 2026-07-10
Summary
POWERGRID's integrated annual report for FY 2024/25, which records the implementing joint venture for the Indian portion of the New Butwal–Gorakhpur 400 kV cross-border line.
Key Findings
- Butwal-Gorakhpur Cross Border Power Transmission Limited was incorporated on 31 August 2022.
- NEA and POWERGRID each hold 50% of the joint venture.
- The joint venture implements the Indian portion of the 400 kV New Butwal–Gorakhpur double-circuit cross-border line.
- Paid-up capital at 31 March 2025 was INR 40 crore, with POWERGRID's share recorded at INR 20 crore.
- POWERGRID's FY 2023/24 related-party disclosure records a project- management-consultancy agreement for the Indian portion, signed on 24 May 2023, with a stated 22-month duration ending 31 July 2025. That is a planned contract period, not evidence that construction or commissioning finished by that date.
Relevance
This is the primary corporate-ownership source for Gorakhpur–New Butwal 400 kV Cross-Border Interconnection. It supports separating Indian and Nepal project sections.
Limitations
Neither the FY 2023/24 PMC disclosure nor the FY 2024/25 annual report provides a post-31 July 2025 physical-progress, testing or completion outcome. Joint-venture capital, incorporation and a planned PMC period do not establish energisation.
Primary Records Consulted
- POWERGRID FY 2024/25 annual report (joint-venture ownership and capital).
- POWERGRID FY 2023/24 annual report (Indian-portion PMC agreement and its stated duration).