Tingla 132/33 kV Substation

Page status
Registry record
Updated
2026-05-13

Open in the interactive explorer and map

Summary

Tingla 132/33 kV Substation is a commissioned 30 MVA Solu Corridor node that connects Solu basin generation into the 132 kV system.

A 132/33 kV, 30 MVA substation commissioned as part of the Solu corridor build. In the annual-book snapshot, Tingla is the bridge intended to connect Solu basin IPP output into the larger 132 kV system once the Mirchaiya–Tingla line is complete.

Key Facts

Parameter Value
Voltage 132/33 kV
Capacity 30 MVA
Status in 2020 book Commissioned
Corridor Solu Corridor 132 kV
Upstream line noted Mirchaiya–Tingla 132 kV double circuit, ~90 km

Why It Matters

Limitations & Controversies

The page confirms the annual-book commissioning record and basic rating, but it does not establish current transformer loading, bay configuration, outage history, or subsequent upgrades after the 2020 source snapshot.

See also