The audited annual reports of Upper Tamakoshi Hydropower Limited (UKHLL), the NEA subsidiary that owns and operates the 456 MW Upper Tamakoshi Hydroelectric Project — Nepal's largest operating hydropower plant. The reports are available at utkhpl.org.np and provide the primary-source generation and financial data for the project.

Key data extracted (from research compilation of audited accounts)

Generation data

Fiscal Year Generation (GWh) % of Design (2,281 GWh) Notes
FY 2079/80 1,945.83 85.3%
FY 2080/81 2,058.36 90.2% Peak operational year
FY 2081/82 1,529.07 67.0% 88-day flood shutdown (Sep 2024)

Financial data

  • Total project cost: NPR 87–89.4 billion
  • Effective D/E ratio at COD: 88:12
  • ICRA D default rating in FY 2081/82 (post-flood)
  • Flood event damage: NPR 1.79 billion physical, NPR 1.43 billion business interruption
  • Insurance claim: NPR 2.0–3.22 billion
  • Rolwaling diversion: 212 GWh addition, dry-season peaking from 4 to 6 hours

Limitations

  • Audit firm unconfirmed: The reports are described as "audited" but the specific audit firm and qualification opinions are not extracted.
  • Post-flood data recency: The FY 2081/82 data (flood shutdown, ICRA D rating, insurance claim) is the most recent extracted; later fiscal-year data is not included.
  • D/E ratio caveat: The effective 88:12 D/E ratio at COD is from UKHLL annual reports but cross-referencing against external debt-registrar data is not done.
  • Insurance range: The insurance claim figure is reported as a range (NPR 2.0–3.22 billion) indicating uncertainty in the claim resolution.