This page currently records back-cover evidence from NEA Annual Report FY 2024/25. On the report's contents page, NEA labels the upper back-cover photo as Khudi 220/132 kV Substation.

That is enough to treat the image as a reliable official visual reference for the substation, even though the annual report does not provide a fuller equipment or commissioning note in the same cover caption.

Summary

Khudi 220/132 kV Substation is recorded here through official NEA FY 2024/25 back-cover evidence. The page is a visual-evidence stub, not a full substation technical profile.

What is confirmed here

  • The annual report's upper back-cover photo is explicitly assigned to Khudi 220/132 kV Substation.
  • The crop on this page isolates that upper photo from the combined back-cover page.

Limitations & Controversies

The page confirms the official image attribution but does not yet verify transformer capacity, bays, commissioning date, connected lines, loading, contractor package, or operational status from a detailed substation source. It should not be used as a complete asset record.