Udipur-Damauli-Bharatpur 220 kV Reinforcement

Page status
Registry record
Updated
2026-05-13

Open in the interactive explorer and map

Summary

Udipur-Damauli-Bharatpur 220 kV Reinforcement is represented in the map as a RAP-backed Udipur-Markichowk-Bharatpur corridor trace for lower Marsyangdi evacuation.

The Udipur-Damauli-Bharatpur 220 kV reinforcement is the lower Marsyangdi evacuation route from the Udipur area toward Bharatpur/Aptari. In the map it is represented as the source-backed Udipur-Markichowk-Bharatpur line because that is the route basis stated in the recovered NEA Marsyangdi RAP.

Key Facts

Parameter Value
Voltage 220 kV
Status Under construction
Corridor ID udipur_damauli_bharatpur_220
Public map feature udipur_markichowk_bharatpur_220_rap_trace
Source basis NEA Marsyangdi RAP pages 22-24
Official route length 64.45 km
Traced network length 65.311 km
Validation delta +1.34%

Map Interpretation

This corridor is now represented by a single RAP-backed trace in the connected transmission layer. It replaces the older RPGCL overview extraction, which showed the same corridor as many disconnected fragments.

The trace should be read as a corridor-level alignment, not a tower-by-tower engineering route. The RAP text gives 64.45 route-km, while the project map labels the same Udipur-Markichowk-Bharatpur line as 67 km. The current map trace falls inside that source envelope.

Confidence

Public decision: default-visible, high confidence.

The confidence comes from three checks: the route is backed by a project RAP, the public feature has no inferred connectors, and the traced length is within 2% of the RAP route-length basis.

Limitations & Controversies

Khudi-Udipur is not forced into this corridor. It should remain a separate scope item unless a route-grade source confirms that it belongs in this segment rather than in the upper Marsyangdi package.

See also