Upper Trishuli-1

Page status
Working page
Updated
2026-05-13

Open in the interactive explorer and map

Summary

Upper Trishuli-1 is a 216 MW under-construction Trishuli River project in Rasuwa, included in the priority-watchlist layer for corridor and grid-buildout relevance.

Upper Trishuli-1 is a 216 MW generation-licence / under-construction-stage project on the Trishuli in Rasuwa. It is pinned in the Layer: Priority Watchlist because it sits in the central-north Trishuli corridor, where hydropower value depends directly on evacuation capacity into the Kathmandu and wider national grid.

Specifications

Parameter Value
Capacity 216 MW
Status Under construction
Registry licence Generation
River Trishuli (Gandaki Basin)
District Rasuwa
Province Bagmati Pradesh

Why It Matters

Upper Trishuli-1 is not a top-10 capacity project, but it is strategically important because of location. Trishuli projects sit close to the country's central load geography and to transmission corridors that matter immediately for domestic reliability. A 216 MW project in this corridor can be more system-relevant than a larger but remote survey marker if it reaches commissioning and evacuates cleanly.

The project also helps explain why the priority watchlist is not just a biggest-MW layer. Upper Trishuli-1 is included for corridor and buildout relevance.

Status And Timing

The generated spec classifies the project as under construction / generation licence. The IPSDP milestone ladder places Upper Trishuli-1 in the ~2025 project bucket, alongside other near-term projects such as Rasuwagadhi, Sanjen, Upper Trishuli 3B, Madhya Bhotekoshi, and Arun 3.

The practical watch items are physical progress, commissioning schedule, grid-connection readiness, and whether output is constrained by the central transmission network.

Map Interpretation

The marker is a river-aligned project reference derived from the registry point. It is suitable for corridor reading, but not a final engineering coordinate.

Limitations & Controversies

The page uses registry and IPSDP timing context and does not independently verify latest physical progress, final commissioning schedule, financing status, offtake terms, or grid-connection readiness.

Registry note

  • Naxa / DoED-linked public hydropower project dataset