Bheri-1 HEP is a 440 MW survey-stage project on the Bheri in Rukum West, promoted in the registry by Gezhouba Group Power Investment Nepal Pvt. Ltd. It is not on the priority watchlist, but it is pinned by the Layer: Top-10 Capacity Projects layer because it is one of the ten largest capacity records in the display set.
Summary
Bheri-1 HEP is a 440 MW survey-stage Bheri/Karnali project carried in the top-10 capacity layer. The page treats it as a capacity-ranking and basin-context marker rather than as a near-term construction project.
Specifications
| Parameter | Value |
|---|---|
| Capacity | 440 MW |
| Status | Survey / study |
| Registry licence | Survey |
| River | Bheri (Karnali Basin) |
| District | Rukum_W |
| Province | Karnali Pradesh |
| Promoter | Gezhouba Group Power Investment Nepal Pvt. Ltd. |
Why It Matters
Bheri-1 matters as a capacity-ranking marker, not because the wiki has strong evidence that it is near construction. Its main analytical role is to keep the Bheri sub-basin visible inside the larger Karnali discussion. The top-10 layer is otherwise dominated by Karnali mainstem, Arun/Koshi, and Tama Koshi projects; Bheri-1 is the large Bheri-side entry in that comparison.
This is exactly the kind of project that tests Installed MW, Energy, Seasonality, and Firm Power Are Routinely Conflated. A 440 MW survey marker can look decisive on a map, but the useful question is whether it has a credible development path, transmission route, financing structure, environmental clearance, and offtake arrangement. The current wiki evidence is much stronger on its registry identity than on those delivery steps.
Status And Timing
The DoED-linked registry snapshot carries Bheri-1 as a survey-stage project. The IPSDP milestone ladder groups Bheri-1 in the 2036-2040 project window, alongside Betan Karnali, Mugu Karnali STO, Tamakoshi 3, Naumure STO, and other later-stage projects.
The practical read is conservative:
| Question | Current Read |
|---|---|
| Is it operating or under construction? | No evidence in the current wiki source set. |
| Is there a confirmed construction start? | Not found in the sources used here. |
| Is there a planning window? | IPSDP groups Bheri-1 in 2036-2040. |
| Why keep it in the wiki? | It is a top-10 capacity marker and a Bheri/Karnali strategic comparator. |
Map Interpretation
Bheri-1 has the weakest locational confidence among the top-10 capacity records: the layer labels it a low-confidence registry reference, even though the registry point sits close to the mapped Bheri reach. The marker is good enough to show that a large Bheri candidate exists in the project inventory. It is not good enough for site-grade analysis.
Limitations & Controversies
The open questions are basic: project design maturity, sponsor status, licence renewal or conversion, grid evacuation, environmental and social impact, and offtake. Until those are documented, Bheri-1 should be treated as a later-horizon planning candidate rather than a near-term capacity addition.