NEA's November 11, 2024 notice of intent to award solar projects under the national utility-scale solar procurement round, using the corrected November 12 amendment as the row-level source for the mapped 960 MW tender / pre-PPA award anchors.
Data Extracted
- Award / LoI row identity
- Bidder
- Substation or named grid node
- District
- Awarded capacity
- Tariff in NPR/kWh
Data-Quality Notes
The corrected NEA table lists 63 awards totaling 960 MW, with awarded tariffs from NPR 4.99/kWh to NPR 5.54/kWh and a capacity-weighted average of about NPR 5.43/kWh. The map uses district or substation anchors with jitter for display. These locations are not parcel coordinates and should not be interpreted as site boundaries. The rows represent tender awards / pre-PPA records, not commissioned operating plants.
Limitations
- Pre-commissioning status: The rows represent tender awards and pre-PPA records, not commissioned operating plants. Awarded projects may be modified, canceled, or stalled.
- Snapshot date: November 2024 — the award landscape and tariff figures may have shifted since publication.
- Coordinate precision: District or substation anchors with jitter are display positions, not parcel coordinates. Not suitable for site boundary or land-use analysis.
- Tariff data: Awarded tariffs (NPR 4.99–5.54/kWh) may not reflect final PPA rates or as-constructed costs.