NEA Notice of Intent to Award Solar Projects (2024)

NEA's corrected 2024 letter-of-intent award table for 63 solar rows totalling 960 MW.

Page status
Working page
Updated
2026-05-12
Last reviewed
2026-07-19
Review due
2026-11-12

Open in the interactive explorer and map

Summary

NEA's November 11, 2024 notice of intent to award solar projects under the national utility-scale solar procurement round, using the corrected November 12 amendment as the row-level source for the mapped 960 MW tender / pre-PPA award anchors.

Data Extracted

  • Award / LoI row identity
  • Bidder
  • Substation or named grid node
  • District
  • Awarded capacity
  • Tariff in NPR/kWh

Data-Quality Notes

The corrected NEA table lists 63 awards totaling 960 MW, with awarded tariffs from NPR 4.99/kWh to NPR 5.54/kWh and a capacity-weighted average of about NPR 5.43/kWh. The map uses district or substation anchors with jitter for display. These locations are not parcel coordinates and should not be interpreted as site boundaries. The rows represent tender awards / pre-PPA records, not commissioned operating plants.

Limitations

  • Pre-commissioning status: The rows represent tender awards and pre-PPA records, not commissioned operating plants. Awarded projects may be modified, canceled, or stalled.
  • Snapshot date: November 2024 — the award landscape and tariff figures may have shifted since publication.
  • Coordinate precision: District or substation anchors with jitter are display positions, not parcel coordinates. Not suitable for site boundary or land-use analysis.
  • Tariff data: Awarded tariffs (NPR 4.99–5.54/kWh) may not reflect final PPA rates or as-constructed costs.