This page currently records cover-photo evidence rather than a full technical corridor brief. On the contents page of NEA Annual Report FY 2024/25, NEA explicitly labels the annual report's front cover image as Chilime-Trishuli 220 kV TL.
That makes the line editorially important inside NEA's own FY 2024/25 framing, even though the annual report does not give a dense technical profile of the line in the cover note itself.
Summary
The Chilime-Trishuli 220 kV Transmission Line page currently records NEA FY 2024/25 cover-photo evidence for the line. It is a source-evidence stub rather than a full technical corridor profile.
What is confirmed here
- The FY 2024/25 annual report uses this transmission line as its front-cover visual.
- The confirmation comes from the contents page caption, not from inferred image matching.
Limitations & Controversies
This page does not yet provide route length, voltage configuration beyond the title, commissioning status, construction history, substation endpoints, or corridor role beyond the annual-report image evidence. It should not be used as a full project profile until those fields are verified from source material.