Nepal's first electricity export to a country other than India. A trilateral arrangement routed through India's grid — making India simultaneously Nepal's competitor, buyer, and logistics gatekeeper.
Key Facts
| Parameter | Value |
|---|---|
| Tripartite PSA signed | October 3, 2024 |
| Parties | NEA, Bangladesh Power Development Board (BPDB), NTPC Vidyut Vyapar Nigam (India) |
| First export | 12 hours on November 15, 2024 (symbolic) |
| Full-scale exports began | June 15, 2025 |
| Export window | June 15–November 15 each year (5 months) |
| Duration | 5-year agreement (until Oct 2029) |
| Current capacity | 40 MW |
| Agreed expansion | 60 MW from June 2026 (+20 MW, pending India's CEA approval) |
| Tariff | 6.40 US cents/unit |
| Currency | USD (unlike India trade in INR) |
| Route | Nepal → Dhalkebar–Muzaffarpur 400 kV → Baharampur–Bheramara 400 kV → Bangladesh |
Revenue
| Period | GWh Exported | Revenue |
|---|---|---|
| 2024 (12 hours only) | negligible | — |
| Jun–Nov 2025 | 147.43 GWh | USD 9.436 million (~NPR 1.35 billion) |
Projects Supplying Bangladesh
NEA currently allocates output from Trishuli (25 MW) and Chilime (22 MW) — older NEA-owned plants — to the Bangladesh export quota. India's CEA has approved these specific 40 MW until October 2, 2029.
Expansion Trajectory
- Nov 2025 (7th JSC meeting): Nepal and Bangladesh agreed to add 20 MW (total 60 MW) from June 2026
- Bangladesh's long-term ambition: import 9,000 MW from Nepal by 2040
- Alternative routes under study: Barapukuria, Panchagarh/Thakurgaon, Bheramara, Comilla corridors through India
- Sunkoshi III (683 MW): Expert committee formed to evaluate this project specifically for Bangladesh supply
- Upper Karnali (900 MW): GMR-developed project had a planned 500 MW PPA to Bangladesh — status uncertain after Sheikh Hasina's fall (Aug 2024)
Limitations & Controversies
India retains structural veto. Every MW to Bangladesh requires India's Central Electricity Authority approval and transits Indian lines. India is simultaneously competitor, buyer, and logistics gatekeeper — market diversification does not reduce political dependence.
Seasonal limitation. Exports only run June–November, perfectly overlapping Nepal's surplus window. The arrangement does nothing for dry-season revenue and is complementary to the Seasonal Arbitrage Trap, not a solution.
Small scale. At 40 MW (expanding to 60 MW), Bangladesh trade is a marginal share of Nepal's export portfolio. Bangladesh's ambition of 9,000 MW by 2040 is aspirational; no committed transmission corridor or financing exists for scale beyond the current trilateral arrangement.
Political fragility. Bangladesh's post-Hasina transition has stalled larger pipeline projects (Upper Karnali PPA, direct transmission studies). The 5-year PSA term (until October 2029) may not survive a major bilateral rupture.
Strategic Significance
- Buyer diversification. Reduces Nepal's monopsony dependence on India's IEX for export revenue
- USD pricing. Bangladesh trade in dollars hedges against INR-NPR forex risk — significant given Nepal Electricity Authority (NEA)'s NPR 2.5B forex losses in FY 2024/25
- India as gatekeeper. Every MW to Bangladesh requires India's Central Electricity Authority approval and transits Indian lines — India retains structural veto over Nepal's market diversification
- Seasonal limitation. Exports only run Jun–Nov, perfectly overlapping Nepal's surplus window — does nothing for dry-season revenue. The arrangement is complementary to the Seasonal Arbitrage Trap, not a solution to it
- Political fragility. Bangladesh's political transition (post-Hasina) has stalled larger pipeline projects (Upper Karnali PPA, direct transmission studies)
Related
- Seasonal Arbitrage Trap — Bangladesh trade is monsoon-only, reinforcing the trap
- India — Energy Relationship with Nepal — India's veto/facilitation role
- Electricity Trade Time Series — revenue figures
- Hydro-Geopolitics — trilateral dynamics
- Dhalkebar–Muzaffarpur 400 kV Cross-Border Interconnection — the 400 kV link that physically carries this trade