Dhalkebar–Muzaffarpur 400 kV Cross-Border Interconnection
- Page status
- Registry record
- Updated
- 2026-05-11
Summary
Nepal's first and — at the time of writing — only operational 400 kV cross-border link. Every exported MWh, including the Nepal–Bangladesh Electricity Trade Route allocation, transits this line. It is the linchpin of Nepal's current export strategy.
Key Facts
| Parameter | Value |
|---|---|
| Voltage | 400 kV (operated initially at 220 kV, upgraded 2018) |
| Status | Operational |
| Commissioned | February 20, 2016 |
| Nepal terminal | Dhalkebar substation (Dhanusha) |
| India terminal | Muzaffarpur (Bihar) |
| Length | ~140 km (≈40 km Nepal + ≈100 km India) |
| Developers | Cross Border Power Transmission Company (CBPTC) — NEA + Indian JV |
| Financing | ADB, KfW |
| Current transfer | ~800–1,200 MW monsoon, ~300–500 MW dry season |
| Interconnection ID | dhalkebar_muzaffarpur |
Significance
- Export artery. Until Gorakhpur–New Butwal 400 kV Cross-Border Interconnection and Inaruwa–Purnea 400 kV Cross-Border Interconnection commission, this is the only 400 kV door out. Roughly 95% of Nepal's 2024–25 export revenue moved through it.
- IEX access. Unlocks the Indian Energy Exchange market — the day-ahead pricing that has made monsoon exports profitable for the first time in Nepal's history.
- Bangladesh corridor. Also the Nepal-side leg of Nepal–Bangladesh Electricity Trade Route, which then transits through India on the Baharampur–Bheramara link.
Limitations & Controversies
- Single point of failure. No 400 kV backup cross-border exists yet. An outage collapses export revenue immediately.
- Indian-side evacuation. Muzaffarpur terminus's onward capacity into India's Eastern Regional Grid is approaching saturation under peak Nepal export scenarios.
- Dispatch veto. Scheduling is set by India's NRLDC — Nepal cannot unilaterally increase flow even when physical capacity exists.