Layer: Storage Shortlist
- Page status
- Working page
- Updated
- 2026-05-12
Summary
This explorer layer highlights storage and storage-like hydropower projects selected for dry-season energy relevance, separating seasonal value from ordinary nameplate-capacity map reading.
Explorer label: Storage reservoirs
Layer group: Hydropower layers
Feature count: 11
Storage and storage-like projects highlighted for dry-season energy value, not just installed MW.
What It Represents
This layer isolates projects that matter for seasonal balancing. Nepal's core hydro problem is not annual water volume alone; it is the mismatch between wet-season abundance and dry-season scarcity. Storage and storage-like projects are treated differently from ordinary run-of-river MW because they can affect dry-season firmness.
The shortlist combines three evidence types:
| Category | Meaning | Projects In Layer |
|---|---|---|
| Operating storage | Existing seasonal-storage asset already serving the system | Kulekhani I-III |
| Under-construction storage | Near-term storage addition in the official project stack | Tanahu |
| Advanced / promising planned storage | Projects with dry-energy or storage figures strong enough to matter for the winter deficit argument | Dudhkoshi Storage, Nalsyau Gad, Lower Badigad, Naumure, Sun Koshi No.3, Madi, Andhi Khola, Kokhajor-1, Lower Jhimruk |
The point of the layer is to separate firm or seasonal value from nameplate capacity. A project with moderate MW can matter more than a larger wet-season-heavy project if it contributes dependable dry-season energy.
Included Projects
| Project | Basin | MW | Dry Energy | Dry Share | Priority Read |
|---|---|---|---|---|---|
| Kulekhani I-III | Bagmati | 106 | n/a | n/a | Only operating seasonal-storage cascade in Nepal; crucial for dry-month balancing and peaking. |
| Tanahu | Gandaki | 140 | n/a | n/a | Most practical near-term new storage addition in the checked official set. |
| Dudhkoshi Storage | Koshi | 670 | 1,252.0 GWh | 37.1% | Largest quantified dry-season block in the checked official Nepal-side sources. |
| Nalsyau Gad | Karnali | 410 | 581.8 GWh | 41.4% | Best dry-energy output in the JICA promising-project set. |
| Lower Badigad | Gandaki | 380.3 | 354.7 GWh | 26.0% | Large Gandaki carryover storage plus strong dry output. |
| Naumure (W. Rapti) | West Rapti | 245 | 309.9 GWh | 26.8% | Very large effective storage for a medium-basin project. |
| Sun Koshi No.3 | Koshi | 536 | 335.9 GWh | 17.8% | Large east-central reservoir block with meaningful dry support. |
| Madi | West Rapti | 199.8 | 170.7 GWh | 27.5% | Moderate MW but useful dry-energy ratio in a water-deficit medium basin. |
| Andhi Khola | Gandaki | 180 | 137.1 GWh | 21.1% | Smaller but still meaningful dry-energy contributor. |
| Kokhajor-1 | Koshi | 111.5 | 94.1 GWh | 33.7% | High dry-energy share for a relatively small plant. |
| Lower Jhimruk | West Rapti | 142.5 | 94.4 GWh | 20.8% | Useful medium-basin storage candidate, though layout conflicts with Naumure in the current design. |
How To Read It
Use it with basin seasonality, cross-border trade, transmission, and priority-watchlist layers. The main question is not "how many MW?" but "how much controllable dry-season support does this project add, and where does that support land in the grid?"
The key fields are:
| Field | How To Use It |
|---|---|
category |
Distinguishes operating, under-construction, advanced planned, and JICA promising-storage records. |
Installed capacity (installed_mw) |
Nameplate capacity; useful but secondary to seasonal output. |
Annual energy (annual_energy_gwh) |
Total expected generation where available. |
Dry-season energy (dry_energy_gwh) |
The most important value field for the storage argument. |
Dry-season share (dry_share_pct) |
Dry-season output as a share of annual energy; useful for comparing differently sized projects. |
total_storage_mcm / effective_storage_mcm |
Reservoir scale where the source provides it. |
Why it matters (priority_read) |
Plain-language reason the project was included. |
source_note |
Shows whether the record comes from NEA annual reporting, NEA-linked project notes, or the JICA/NEA storage master plan. |
The layer works best as a filter over Nepal's broader hydro portfolio. It keeps the storage question visible while the user inspects large projects, transmission corridors, and seasonal trade behavior.
Coverage / Method
The layer is built from the storage shortlist annotations and the related dry-energy comparison table. It includes operating storage, under-construction storage, and advanced or promising planned storage records where the cited project context provides enough storage or dry-energy information to support inclusion.
Caveats
Storage labels do not settle design, resettlement, environmental, financing, treaty, or procurement questions. Some projects are storage-like or proposed rather than confirmed deliverable storage assets.
Several records are planning candidates from the JICA/NEA storage master-plan material rather than committed projects. Dry-energy values are analytical anchors, not delivery forecasts. Location precision also varies: some markers use project or operating-plant points, while others use river anchors because the public source is stronger on project concept than on map geometry.
The shortlist has 11 map features, while Storage Capacity Comparison also discusses Chera-1 in the broader 12-project table. Chera-1 is retained in the tabular research workspace but is not currently exposed as a map marker in this layer.
Linked Data
- storage_shortlist_annotations.geojson - 11-feature explorer annotation layer.
- nepal_storage_dry_energy_shortlist.csv - 12-project dry-energy table, including fields not all shown on the map.
- Storage Capacity Comparison - wider storage-gap and dry-energy comparison context.