Sun Koshi No.3

Page status
Working page
Updated
2026-05-13

Open in the interactive explorer and map

Summary

Sun Koshi No.3 is a 536 MW Koshi basin storage candidate with large reservoir volume and a 2031-2035 planning-window placement in the current IPSDP milestone layer.

Sun Koshi No.3 is a 536 MW JICA promising-storage candidate in the Koshi basin. It is pinned in Layer: Storage Shortlist because it combines large reservoir scale with meaningful dry-season output in Nepal's eastern-central hydro corridor.

Specifications

Parameter Value
Capacity 536 MW
Status Survey / study
Category jica promising storage
Basin Koshi (Koshi Basin)
Annual energy 1883.6 GWh
Dry-season energy 335.9 GWh
Dry share 17.8%
Total storage 1220.0 MCM
Effective storage 555.0 MCM

Storage

Parameter Value
Total storage 1220.0 MCM
Effective storage 555.0 MCM

Output

Parameter Value
Annual design energy 1883.6 GWh
Dry-season energy 335.9 GWh
Dry-season share 17.8 %
Type Storage

Sources

Why It Matters

Sun Koshi No.3 has 1,220 MCM total storage, 555 MCM effective storage, and 335.9 GWh of dry-season energy in the storage-shortlist table. Its dry share, 17.8%, is lower than Nalsyau Gad, Dudhkoshi, or Kokhajor-1, so the case for the project rests more on total reservoir block and basin position than on dry-share efficiency.

This makes it a useful comparator for Dudhkoshi Storage Hydroelectric Project. Both are Koshi-basin storage candidates, but they occupy different strategic roles: Dudhkoshi is the stronger quantified dry-season block, while Sun Koshi No.3 is a large east-central storage option with different location and transmission implications.

Status And Timing

Sun Koshi No.3 is a planning candidate, not an active construction project in the current wiki evidence set. The IPSDP milestone ladder groups Sunkoshi 3 STO in the 2031-2035 window.

Watch for updated feasibility, developer structure, environmental approvals, financing, and how the project is treated in relation to downstream river regulation and cross-border hydrology concerns.

Map Interpretation

The current map marker is a river anchor. Use it for basin and strategic comparison, not for final dam-axis or reservoir-boundary analysis.

Limitations & Controversies

The page treats Sun Koshi No.3 as a planning candidate and does not confirm updated feasibility design, developer structure, financing, environmental approvals, dam-axis coordinates, or reservoir-boundary impacts.

Registry note

  • JICA/NEA storage master plan volume 2