NEA Transmission Annual Book 2077
- Page status
- Registry record
- Updated
- 2026-04-20
Summary
Official Nepal Electricity Authority annual-book publication for FY 2019/20 (B.S. 2077). The volume mixes directorate narrative, project status notes, site/substation photographs, appendix tables, and map pages. For the wiki, its highest-value material is in the transmission chapter and appendix: project-by-project line/substation status, existing substation capacity, and under-construction high-voltage grid inventory.
Contents
| Section | Page |
|---|---|
| Message from the Minister | 2 |
| Message from the Secretary | 4 |
| Board of Directorates | 5 |
| Organisation Structure | 6 |
| Deputy Managing Directors | 7 |
| Managing Director's Report | 8 |
| Generation Directorate | 21 |
| Transmission Directorate | 43 |
| Distribution and Consumer Services Directorate | 76 |
| Planning, Monitoring and Information Technology Directorate | 103 |
| Engineering Services Directorate | 110 |
| Project Management Directorate | 141 |
| NEA's Subsidiary & Associate Companies | 159 |
| Central Activities | 192 |
| Administrative Directorate | 199 |
| Finance Directorate | 204 |
| Statistic & Schematics | 220 |
| Electricity Tariff | 232-238 |
| Appendix | 239-263 |
| Map | 264-265 |
Relevance to Project
This is the primary official source for NEA's mid-2020 view of the transmission system. It is especially useful for:
- Hetauda–Dhalkebar–Inaruwa 400 kV Backbone stage/status details
- Dhalkebar–Muzaffarpur 400 kV Cross-Border Interconnection substation and energization context
- appendix-level substation capacity and under-construction inventory pages
- project/program pages that need official inline figures rather than generic district scenery
Local Source
Local workspace copy: nea_transmission_annual_book_2077.pdf
Limitations
- FY 2019/20 snapshot: Post-2020 commissioning outcomes for projects listed as under-construction are not covered.
- Superseded for totals: Later FY 2024/25 system totals in NEA Annual Report FY 2024/25 replace the aggregate figures here.
- No technical modelling: Does not contain detailed load-flow or dispatch modelling.
- Mixed genre: Directorates narrative, project status notes, and appendix tables may include promotional framing alongside raw data.
What This Source Does Not Cover
- post-2020 commissioning outcomes for projects still under construction here
- later FY 2024/25 system totals already superseded in NEA Annual Report FY 2024/25
- detailed load-flow or dispatch modelling