Hetauda–Bharatpur–Bardaghat 220 kV Corridor
- Page status
- Registry record
- Updated
- 2026-05-11
Summary
The 220 kV east–west spine across central Nepal, running through the Hetauda → Bharatpur → Bardaghat load corridor. This is the line that carried Nepal's grid before the 400 kV era — and still carries the majority of Terai distribution load.
Key Facts
| Parameter | Value |
|---|---|
| Voltage | 220 kV (double circuit) |
| Status | Operational |
| Length basis | 146.5 route-km / 293.0 circuit-km |
| Owner | Nepal Electricity Authority (NEA) |
| Terminals | Hetauda (Makwanpur) · Bharatpur (Chitwan) · Bardaghat (Nawalparasi) |
| Corridor ID | hetauda_bharatpur_bardaghat_220 |
Map Interpretation
The connected transmission layer now represents this corridor as two source-controlled features: Hetauda-New Bharatpur and New Bharatpur-Bardaghat. This replaced the older over-selected RPGCL extraction, which mixed adjacent 220 kV fragments into the HBB corridor.
Current validation result: 2 features, 0 inferred connectors, 0 remaining endpoint gaps, and 143.365 km traced length against a 146.5 route-km basis.
Public decision: default-visible, caveated.
Significance
- Load-centre spine. Serves the Bharatpur–Hetauda–Butwal urban belt, Nepal's second-largest consumption cluster after the Kathmandu Valley.
- Redundancy for 400 kV. During HDDI outages this corridor provides a lower-voltage fallback for east–west flow, at reduced capacity.
- Tie-in for western generation. Connects Marsyangdi-basin and Kali Gandaki-basin output to the central grid before the MCA Central 400 kV Corridor (Lapsiphedi–Ratmate–Hetauda–Damauli–Butwal) fully commissions.
Limitations & Controversies
- Legacy capacity. 220 kV thermal limits constrain the amount of surplus generation the corridor can absorb; during monsoon peak, IPPs in the west are partly curtailed despite availability.
- Substation bottlenecks. Bharatpur's bus configuration has been flagged as a weak link in NEA's 2024 reliability review.
- Geometry precision remains caveated. The public route is now coherent and source-bounded, but the Bharatpur-Bardaghat portion is still a corridor-level SIA trace rather than a tower-by-tower alignment.
See also
- MCA Central 400 kV Corridor (Lapsiphedi–Ratmate–Hetauda–Damauli–Butwal) — the 400 kV reinforcement
- Dana–Kushma–New Butwal 220 kV Corridor — the 220 kV it links with in the west
- Hetauda–Dhalkebar–Inaruwa 400 kV Backbone