Summary
The west-central hydropower evacuation corridor — running from the upper Kali Gandaki valley (Dana, Kushma, Parbat) down to New Butwal. Built to pick up the cluster of IPPs in the Modi and Kaligandaki tributaries and tie them into the growing western grid.
Key Facts
| Parameter | Value |
|---|---|
| Voltage | 220 kV |
| Status | Operational |
| Length basis | 127.57 route-km / 255.6 circuit-km |
| Owner | Nepal Electricity Authority (NEA) |
| Terminals | Dana (Myagdi) · Kushma (Parbat) · New Butwal (Rupandehi) |
| Commissioned | Dana-Kushma and Kushma-New Butwal sections now operational; New Butwal fully operational since October 2023 |
| Corridor ID | dana_kushma_butwal_220 |
Map Interpretation
The major transmission network now represents this corridor as two source-backed 220 kV double-circuit features: Dana-Kushma and Kushma-New Butwal. The geometry comes from RPGCL official vector linework, while the length/status basis comes from NEA transmission and annual reports.
Current validation result: 2 features, 0 inferred connectors, 0 remaining endpoint gaps, and 128.027 km traced length against a 127.57 route-km basis. Public decision: default-visible, operational, high confidence.
Significance
- Unlocks a trapped basin. Before this corridor, the Modi / upper Kali Gandaki IPP cluster had to evacuate through congested 132 kV toward Pokhara. Dana–Kushma–New Butwal gave the basin its own exit.
- Pre-positions for 400 kV. Terminates at New Butwal, the same substation that will host the MCA Central 400 kV Corridor (Lapsiphedi–Ratmate–Hetauda–Damauli–Butwal) terminus and the Gorakhpur–New Butwal 400 kV Cross-Border Interconnection.
- Significance for Kali Gandaki A's downstream cascade. The corridor accommodates future cascade additions in the basin.
Limitations & Controversies
- Terrain risk. Myagdi-Parbat segment climbs steep, landslide-prone terrain; 2023 monsoon damage required emergency tower reinforcement.
- Still 220 kV. As the Gandaki Basin pipeline grows, 220 kV may again become the bottleneck; the MCA Central 400 kV Corridor (Lapsiphedi–Ratmate–Hetauda–Damauli–Butwal) and Gorakhpur–New Butwal 400 kV Cross-Border Interconnection make New Butwal the reinforcement point to watch.
See also
- Kali Gandaki A — the basin anchor
- MCA Central 400 kV Corridor (Lapsiphedi–Ratmate–Hetauda–Damauli–Butwal) — the 400 kV it links to
- Gorakhpur–New Butwal 400 kV Cross-Border Interconnection — the cross-border at New Butwal
- Layer: Major Transmission Network — the public layer where this corridor now appears