Dana–Kushma–New Butwal 220 kV Corridor

Page status
Registry record
Updated
2026-05-11

Open in the interactive explorer and map

Summary

The west-central hydropower evacuation corridor — running from the upper Kali Gandaki valley (Dana, Kushma, Parbat) down to New Butwal. Built to pick up the cluster of IPPs in the Modi and Kaligandaki tributaries and tie them into the growing western grid.

Key Facts

Parameter Value
Voltage 220 kV
Status Operational
Length basis 127.57 route-km / 255.6 circuit-km
Owner Nepal Electricity Authority (NEA)
Terminals Dana (Myagdi) · Kushma (Parbat) · New Butwal (Rupandehi)
Commissioned Dana-Kushma and Kushma-New Butwal sections now operational; New Butwal fully operational since October 2023
Corridor ID dana_kushma_butwal_220

Map Interpretation

The major transmission network now represents this corridor as two source-backed 220 kV double-circuit features: Dana-Kushma and Kushma-New Butwal. The geometry comes from RPGCL official vector linework, while the length/status basis comes from NEA transmission and annual reports.

Current validation result: 2 features, 0 inferred connectors, 0 remaining endpoint gaps, and 128.027 km traced length against a 127.57 route-km basis. Public decision: default-visible, operational, high confidence.

Significance

Limitations & Controversies

See also